Making progress on the slab. Used free wood I ripped and cross cut to size on my table saw. Screwed the pieces together with my corded drill. Dug down where the form was to be placed and added some gravel so it would be easier to level.
Now it's pretty close to level. Close enough, anyway. I secured the form into place with some old rebar tent stakes with rings welded on at the top.
Still need to add a little more gravel inside the form, wet it down and pack it, then dig down around the inner edges of the form, and around the well casing so the concrete is deeper (4") at those areas, creating a footing. The rest of it will be about 2" thick.
Now it's pretty close to level. Close enough, anyway. I secured the form into place with some old rebar tent stakes with rings welded on at the top.
Still need to add a little more gravel inside the form, wet it down and pack it, then dig down around the inner edges of the form, and around the well casing so the concrete is deeper (4") at those areas, creating a footing. The rest of it will be about 2" thick.