I know it will be slow going beacuse its only me and hubby working on it, and I only have 2 days off a week but I hope I can get it done fast! I only have 20 days left before the birds have to be moved. I've got a good amount of FREE wood from my brother (he works at a place that makes pallets and crates from wood) so far (about half of what I need) and I am going to try to get more tomorrow. I have enough to frame out the floor and the end walls. I need to go get my permitts and level the ground today. I want to get a load of white rocks to put down as my foundation and the the work will begin! Wish me luck! Its going to be 8x16 foot and I scored some free windows from freecycle that I am also going to pick up today! I hope it turns out nice! I'll try to take some pics as I go allong.
JEN

Last edited: