GopherBoy got up early this morning to start work on the coop.

100_0015-19.jpg
We had a little mole problem on the farm....
so something had to be done.................
killmoles.jpg


After that commercial break......we found the area in the yard we wanted the coop


maybe the chickens picked the spot....
100_0019-12.jpg


the spot was then cleared and raked
100_0021-8.jpg


100_0022-5.jpg
the legs have been attached and we needed the small boy child to make sure it was all level

100_0023-5.jpg
ok, we used old waterbed frame, and some poopy 4x4's we got from the fat dead mans place in Portland and now have the floor framed.

100_0001-14.jpg





100_0002-15.jpg


sketch.jpg

this is juzt the starting sketch
it will be 3'6" off the ground
and the floor is 6'10" X 7'6" (so far)




Here is the start of the front deck
100_0004-18.jpg
GopherBoy got the floor sheeted and needed to take a break to look at the plans again.

100_0009-14.jpg

there always needs to be one of the flock there to see whats going on.
100_0006-13.jpg


100_0013-17.jpg
Measure off the deck surface to the ground or pad.

100_0015-20.jpg
all measurements must carefully be written down on a block of wood, using anything else would not be professional

100_0016-14.jpg
using a construction calculator we figure out our rise for our steps.

100_0018-14.jpg
mark on the framers square the rise and the desired tread width with a sharpie pen (more details on the measurements in the following drawing)

100_0023-6.jpg
line up both marks on the square to the edge of the board and trace them out.

100_0025-6.jpg
Skillfully cut the lines out with a skill saw then use a hand saw to finish the cuts

100_0028-7.jpg
On the last tread cut the thickness of your treads off the bottom, in this case the tread thickness is an inch and half

100_0030-5.jpg
there’s the stringer…being tested out.


100_0033-2.jpg
then we screwed the treads on


100_0034-3.jpg

done deal…..there are steps to the deck. Time to quiet for tonight


steps.jpg
One of the walls is up
100_0038-2.jpg


100_0037-2.jpg

and the pop door in installed in the tracks
closed:
100_0036-4.jpg


and opened:
100_0040-2.jpg

100_0039-4.jpg




100_0047-3.jpg

I wasnt supposed to get Lance in the picture
100_0046-2.jpg

Ok, this was the first attempt at the roof framing......

WRONG
100_0001-15.jpg


after thinking about it all night, it's correct now, and a pattern has been made...
CORRECT
100_0002-16.jpg


GopherBoy estimates that by the time it is done, it will be around 75 feet tall

100_0003-16.jpg


Todays word is patience. I cut all my rafter birds mouths wrong. But like anthing else you can fix it. Walk away figure it out go back. So I did but in the process of cutting the fix it boards I cut through my wagon. Ok walk away eat some lunch go back put on my gloves and one of the birds pooped in it
100_0007-10.jpg ..................walk way walk away

100_0008-16.jpg


100_0009-16.jpg


Sometimes GopherBoy works to fast, and is really hard on his tools

100_0010-20.jpg

funny how his hammer breaks...and this was in his back pocket
100_0011-18.jpg


This is how we are going to cut our rafter tails
We don’t want them below the window so we squared off the window header to determine the length

100_0005-19.jpg

We square of this mark and transfer the line to the rafters at each end of the building