⭐ Kiki's Year Long 🌶️

We finished hanging all the Sheetrock, MuD #1 applied and sanded, Mud # 2 applied. Will sand and complete tomorrow (1 problem area where 3 drywall sheets come together still needs some leveling) returned stuff to 2 stores, picked up special order cabinet, bought primer and chose paint color and bought paint. Tub surround shipped early so will hopefully have everything ready to install it by next weekend.
 
We finished hanging all the Sheetrock, MuD #1 applied and sanded, Mud # 2 applied. Will sand and complete tomorrow (1 problem area where 3 drywall sheets come together still needs some leveling) returned stuff to 2 stores, picked up special order cabinet, bought primer and chose paint color and bought paint. Tub surround shipped early so will hopefully have everything ready to install it by next weekend.
Oh and we cooked dinner and mr muddy just got his shower. DS is cooking apple pie for dessert (box not scratch 🤣)
 
I'm pretty sure the ceiling is going to cave in any minute...hopefully someone rips it out and fixes it right before it does.
As soon as that is done I'll be painting.
 
I'm pretty sure the ceiling is going to cave in any minute...hopefully someone rips it out and fixes it right before it does.
As soon as that is done I'll be painting.
Yes I wish we hadn’t had to go to such extremes, but there was a lot of water damage in the old walls.
 