ok we have lived in this house for going on 5 years. when we moved in we knew that there was a lot of work to be done. we are slowly starting...
first thing was the master bathroom...
the tub was a cheapo plastic tub with a crappy glass door. the tub was cracked under the spigot and had prolly been like that for several years before we moved in.... when we stepped in the tub, it would give and i always worried about falling through the floor
stage one, before
you can kinda see the crack in the tub..
stage two after removing the tub and surround
the entire floor was weak under the tub its amazing i didnt fall through it!
part of the new floor.
floor and tub in
and then TODAY!
YAY im so glad its done!! isnt it beautiful!
first thing was the master bathroom...
the tub was a cheapo plastic tub with a crappy glass door. the tub was cracked under the spigot and had prolly been like that for several years before we moved in.... when we stepped in the tub, it would give and i always worried about falling through the floor
stage one, before


you can kinda see the crack in the tub..
stage two after removing the tub and surround

the entire floor was weak under the tub its amazing i didnt fall through it!

part of the new floor.

floor and tub in
and then TODAY!

YAY im so glad its done!! isnt it beautiful!
Last edited: