Okay, quick summary....
CX 8 - 10 weeks
CX slow grow, red broilers, freedom rangers 10 - 12 weeks ( minimal starter crowing)
Dual purpose some 16 weeks, most 18-20 weeks, some longer (more crowing/ fighting depending on the breeds/ birds and more variable sizes)
Three experienced chickeners can get the job done, including clean-up within three hours for 25 Red Broilers. One prepping the carcass (bless,kill, scald, pluck), one cleaning ( gutting and separating the organs out) and washing and one kid chicken wrangling and filling the killing cones.
It did take us longer when we first started, I think my first bird ever took about an hour, most of that getting the scalding water just right and everything seemed awkward and then I gutted real slow because I did not want to make a mistake and I needed to figure out what I was looking at, etc. Now, we have it down and if you have more help, then the faster it goes.
Hope this helps....
CX 8 - 10 weeks
CX slow grow, red broilers, freedom rangers 10 - 12 weeks ( minimal starter crowing)
Dual purpose some 16 weeks, most 18-20 weeks, some longer (more crowing/ fighting depending on the breeds/ birds and more variable sizes)
Three experienced chickeners can get the job done, including clean-up within three hours for 25 Red Broilers. One prepping the carcass (bless,kill, scald, pluck), one cleaning ( gutting and separating the organs out) and washing and one kid chicken wrangling and filling the killing cones.
It did take us longer when we first started, I think my first bird ever took about an hour, most of that getting the scalding water just right and everything seemed awkward and then I gutted real slow because I did not want to make a mistake and I needed to figure out what I was looking at, etc. Now, we have it down and if you have more help, then the faster it goes.
Hope this helps....
The meat birds are bred to be ready at their suggested week and dual purpose, well it really just depends on lots of things. Sex, breed, space, fighting, crowing. You can weigh them and have a general idea of size. I have done both and I kinda like being able to plan my processing and just get it done all at once.