A lot! I'm rewiring two rooms in the basement and all the drywall has to go up and be finished. Then drop ceiling with LED recessed lights, flooring and trim. I'm grindng open wall and floor cracks to prep them for epoxy then Dryloking the walls. I've got trim and paint left in the kitchen, new walls, floors and lighting in the great room, hall and 1/2 bath. Rebuild the deck, dig out and repour the front porch slab, landscape, new roof, new garage doors, clean up electric panel,.....DL, how much more work do you have to do on your dad's place? And how is Miss Bella?
Bella is great. Getting better daily.
Last edited: