I think I know where your rain went. It hasn't started yet, but I thought I felt a few drops so I put the tools away and came in..
I took a picture or two.
One of the floor frames about ready for OSB
close up of the bottom channel where the window frame will fit in.
first piece of OSB in place. The block at the left is where one of the hinges will be fastened to. The OSB will cover it and then the hinge will be installed.
Each floor section is 6 feet long and 3 feet wide.. All ground contact treated wood..
........jiminwisc,,,,,,
I took a picture or two.
One of the floor frames about ready for OSB
close up of the bottom channel where the window frame will fit in.
first piece of OSB in place. The block at the left is where one of the hinges will be fastened to. The OSB will cover it and then the hinge will be installed.
Each floor section is 6 feet long and 3 feet wide.. All ground contact treated wood..
........jiminwisc,,,,,,