- Thread starter
- #51
At this point the girls are still in the basement and I am still working on the chicken house. I now have all the wire pulled but am needing someone that is good with elect. to give it a look see as I am sure there is something I need to correct being that this is my first time putting in wire in a house. I ended up pulling 150 feet of wire.Thought that 50 feet would do but.... why not do it right. So, there will be an overhead light in the house, a overhead light in the covered run, 2 sockets inside the house, 1 exterior socket (for Christmas lights!!), and one exterior flood light.
And I have to decide on an attractive way to brace the windows open and to lock them down. Wood bracers like I am presently using aren't terrible but I'd like something better.
.
And I have to decide on an attractive way to brace the windows open and to lock them down. Wood bracers like I am presently using aren't terrible but I'd like something better.
.
