- Thread starter
- #131
Exactly!
....and even work on it during any rain.
DH has been watching roof installation videos for the past 3 days. There's one piece of odd-shaped flashing that came with the metal that he's not certain where it's supposed to go.
He figures that he and DS#3 can probably handle the roof installation but that we'll want a crew for the wire, which will run vertically.
We bought electric shears for cutting the metal and when I tried them on scrap hardware cloth it was as easy as cutting cloth with good sewing scissors. We will, however, try them on some scrap metal before touching the good stuff.