
We were able to work for about 3 hours this afternoon after unloading lumber. We got the foundation posts dug and set, the flooring framed up, and the first of three plywood sheets for the floor nailed down. Tomorrow we hope to get the rest of the floor done and hopefully start framing up walls!
Whats amazing to me is the current coop is smaller than that fullsize piece of plywood my daughter is standing on!