- Jul 24, 2009
- 68
- 0
- 29
Here's our first night of work on the new coop after getting a load of free wood from a receiving dept. at a local factory.
DH lagged the 4x4'a together with 5 1/2" lags countersunk 1". No plans at this point.
Next he put the floor on. This was a piece of osb board we had laying around for quite a while.
The next night when I got home from work this is what I saw!


DH lagged the 4x4'a together with 5 1/2" lags countersunk 1". No plans at this point.

Next he put the floor on. This was a piece of osb board we had laying around for quite a while.
The next night when I got home from work this is what I saw!

Last edited: