cmccullough1390
Songster
So much progress over 2 days
Day 1
Day 2 Sealing floor one more coat to go lol
Lots done still need to cement the edges for extra predator proofing, gate, netting on top with two beams so I can hang feeder and water, inside we need to make nesting boxes, install removable roost, paint last layer, add sand bedding, and hang water and feeder
Day 1
Day 2 Sealing floor one more coat to go lol
Lots done still need to cement the edges for extra predator proofing, gate, netting on top with two beams so I can hang feeder and water, inside we need to make nesting boxes, install removable roost, paint last layer, add sand bedding, and hang water and feeder
Last edited: