I'm glad you'll be able to use it at some point.
We're getting it done slowly but surely. Hubs finished building the new lower cabinets & drawer fronts and we have all of them stained & now he's making the new doors. We've started on the upper cabinets getting them ready to paint & he still has to build a new upper cabinet & the new range hood cabinet. There are still a lot of steps in between. Everything takes so much time, but at least my kitchen is still somewhat functional. We have all of the base cabinets sitting in our main, garage & deck entryways.
Here's my new sink cabinet.
Making sure the sink fits & a picture of it with the new pull out garbage & dishtowel drawer installed.
View attachment 2548084
We have a section of the old countertop set on it so we have a little more work space.
View attachment 2548083
The cabinet on top is brand new, it's replacing my desk, it will be nice to have some extra storage & the bottom one is the original, but newly stained pots & pans cabinet.
View attachment 2548082
The blonde colored drawers will have the new drawer fronts on them, the stained drawers are finished, they will be behind behind cabinet doors.
We will install the new tile before we put the base cabinets back in, it matches the tile you see in the bottom picture. Still, lots to do!