worked more on the bathroom today.
I am getting SO tired of this project. The final texture went on the walls yesterday. I filled any missed bits before and re-textured those bits first thing this morning.
I've let it all dry all day long.
Tomorrow after shots and errands, I MIGHT get to sanding it down lightly and sealing/priming it. Then the whole room gets two coats of color.
Today , I did a LOT of pick up as tomorrow is trash day.
I also finished painting the faux hinges on the barn door, to include installing screws (which needed painted black and sealed). I cleaned and sealed the knobs and installed those.
Washed the glass and re-made and installed the wood pieces that hold that in.
I also wiped down the linen cabinet and installed at the new, but old looking, hardware.
Phew.
DH helped me move the bench and the linen cabinet from the basement and garage into the front room so we don't have to do that later in the cold and rain. I promise,the day I'm ready for them will be miserable. (Except now it won't be. as they're moved inside.)
All that and I had time for a noise triggered anxiety attack and got ham and beans on the stove. LOL.
Please excuse handle. It's on temporarily. I need longer screws - black ones.
View attachment 3707536View attachment 3707533