ChickyCh00k
Will Work For Chickens
I have the same type of run as you (different roof shape, but otherwise very similar). I'm planning to zip tie 1/2" pvc to the hardware cloth, about 3ft up, leaving the top 12" or so open for ventilation. Then I'm going to use 1/2" pvc clamps to fasten the 6mil sheeting to the pvc pipes. I'm going to leave an apron (held down with heavy rocks or bricks) at the bottom so when snow melts it doesn't leak in underneath. I don't know if that makes sense, lol.not home at the moment but might be 4’. Then three or four panels cut in half might cover the bottom half as a wind break of sorts. I’m just thinking of the wind actually grabbing the panels unless they over lap and have a hundred zip ties.
Looks like I should experiment with a piece or two. I wondered about running the widest longest 6 mil I can find attaching it to 4x4 on one side and rolling it over to the other side and attaching it to another 4x4?
But that’s a lot of expensive wood since each side is 12 1/5’ wide.
Here's pics (the red line is where I'm planning to attach the pvc pipe, and the red dots are where I'll place weights and let about 18" of apron extend out past). Also, the entire roof is now covered in tarp (That's why I'm leaving the space between the pvc and the horizontal bar)