Quote:
Thanks. The colors are to match our carport and somewhat blend in with our brick house...so we're sticking to the red/white as much as possible.
Including the run and the nursery/storage room.....in the year 2016!
Everytime I put a date on it, something happens that makes me get way behind on it. I've got a lot to do yet......
Finish walls in both rooms
Paint walls
Lay vinyl flooring
rent a trencher and get a trench ran from the house to the coop
install the electrical wire and water lines to the coop
wire up the electrical panel, light sockets, plugs, exterior lighting
install utility sink and pipe it
build window frames and have glass cut for them
install the windows
build cabinets in the storage room
stain and seal cabinets
finish trim outside
finish painting exterior walls and trim
Build nesting boxes, paint, trim and install
frame out vent doors and build vent doors
Finish digging the post holes for the run
install fencing around run
install trim boards around run
Build entrance door to run
(I'm sure my wife has a long list that she's not even mentioned to me yet that she'll dump on me when I'm almost done with the list)
All in all....I'd have to say at least another 3 or 4 weekends to get most of it done.
Not doing too much during the week because I'm working 4-10's and by the time I get home at 5:15 pm, eat, do standard duties around the house and answer emails, it's time to hit the sack. So Saturday, Sunday and Monday are my main days to work on it.