started with the base around 9am this morning
framed it up
in the back is the nest boxes(bottom) and above that will be the roost
next we framed the roof
then we moved it to its final location in the back yard
then all the sudden we had a rain storm and had to bring it back into the carport so we could add the walls
that was all for the day and we ended it at 7:30. next week we are going to paint it a build the run. that will be it and the chickens should be ready to move in soon after that.
all done now. the roof gets shingles on monday.
framed it up
in the back is the nest boxes(bottom) and above that will be the roost
next we framed the roof
then we moved it to its final location in the back yard
then all the sudden we had a rain storm and had to bring it back into the carport so we could add the walls
that was all for the day and we ended it at 7:30. next week we are going to paint it a build the run. that will be it and the chickens should be ready to move in soon after that.
all done now. the roof gets shingles on monday.
Last edited: