- Thread starter
- #11
Finally went to bed pretty late.
He got up before me this morning and was going through all the info books the inspector left.
We have both calmed down. He understands it better now.
He was mad because all the new regulations ran up the cost from $900 to $1500.
I can understand that, but I'm not the one to have passed them.
So far we have only needed 2 permits on the house. The sewer and the electrical.
that was my biggest concern. Get the house finished without the permit, get reported, get fined and have to tear all the sheet rock down.
He got up before me this morning and was going through all the info books the inspector left.
We have both calmed down. He understands it better now.
He was mad because all the new regulations ran up the cost from $900 to $1500.
I can understand that, but I'm not the one to have passed them.
So far we have only needed 2 permits on the house. The sewer and the electrical.
that was my biggest concern. Get the house finished without the permit, get reported, get fined and have to tear all the sheet rock down.