So on top of having to clean the rest of the main floor and cooking Thanksgiving dinner NOW I have to move stuff as plumber want to start installing the new boiler on WEDS
He picked up the partial payment check (10,000.00) today and gave Angie a list of what I need to do before weds Morning I am NOT ripping the carpet off the stairs he is just going to have to deal with it., The new boiler weighs 600 pounds so I also will need to round up another body or 2 to help get it downstairs. UFFDA UFFDA UFFDA
The stuff to be moved included all the electronics as well , tv,xbox,tuner,vcr,cd player, and some other stuff.