taylorducks21
In the Brooder
- Apr 28, 2021
- 5
- 16
- 24
Hi All, I am in the process of completing my run for my 6 pekins. To prevent digging from the outside I am going to do a HC apron. I read a lot about digging down and burying the HC, but I don't quite understand what that means.
Here is my question...I have a sloped backyard, and to make the run level, I had to dig up some areas to lay the base and build up other areas. One corner in particular is built up about the height of a standard cinder block. I have filled this in with dirt and soil from the other digging.
How do I prevent predators from getting under this part? Do I still attach the HC to my base board and run the apron down to the rest of the yard and out 2 feet? If I do that, should I put something like pavers or bricks up against it?
Any ideas are appreciated, I want to keep my babies safe.
Thanks
Here is my question...I have a sloped backyard, and to make the run level, I had to dig up some areas to lay the base and build up other areas. One corner in particular is built up about the height of a standard cinder block. I have filled this in with dirt and soil from the other digging.
How do I prevent predators from getting under this part? Do I still attach the HC to my base board and run the apron down to the rest of the yard and out 2 feet? If I do that, should I put something like pavers or bricks up against it?
Any ideas are appreciated, I want to keep my babies safe.
Thanks