@Kris5902 That's a lot of work! You should treat yourself to a nice cup of hot cocoa before you head to bed.
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
The floor...or...?to get the remaining concrete poured ASAP.
Well, the forms are basically all off, and I’m quite pleased with myself... been working in a gentle drizzle all day but no real rain. I should have the leveling, fill and floor drain all done tomorrow. Hoping to send in pictures on Tuesday to the building department and to get the remaining concrete poured ASAP.
View attachment 1955612View attachment 1955613View attachment 1955614
Just a little bit bigger than a chicken coop!It’s a 40x40’ house, that front left section is a 20x20’ main floor master bedroom with en-suite for my Mom, library in the front right corner, and the back half of the house is Kitchen/dining/living room (left to right) The little bump out is for French doors to a south facing deck. Yes, I pulled off all the boards in those piles, and there’s two more you can’t see! Plus all the small stuff already in the burn piles.
I’d be Sleeping already if it weren’t for having to put the chickens up tonight.
The floor...or...?