Not quite level...there is a bit of a grade so the water runs off. At the end, I'm going to slope that from the lower level to the upper. I'll bet that is going to be a challenge.
The engrave bricks came from the family church that closed down. There is a 12 x 12 brick that will be set to feature a park bench that will go on the lower tier.
I really like these types of projects but they sure are time consuming. Demolition, haul away and prep work has taken up 3-4 weekends. And that was before the first brick was laid. My friend thought that this was just a weekend project.