Garden Plans for this week - seed shopping.
But, have been not doing a thing in the garden for awhile. The bathroom remodel is progressing. Electric newly done and a few problems corrected. New high powered fans installed and vented outside (2 new holes in side of the house so they vent outside). Electric Inspector signed off. Plumbing: new main water lines installed under house - previously only 1/2" pipe supplied the whole house, now we are at 3/4" with 1/2' supply lines to the individual things - all copper. All new vent pipes installed per building codes, and all new PVC drain and septic pipes installed throughout most of the house - this time PVC Primer was used, along with glue bc unfortunately the previous stuff was never primed, and literally fell apart as they were down there beginning to work!! luckily it was always the plan to replace it anyway. Plumbing inspector signed off. Insulation tacked up in the ceiling, bracing installed for any future grab bars and for towel bars.
Today: DRYWALL!! yay! not sure if it will all get up today, as it is going to be tight - these are bathrooms, so space isn't huge and open like a bedroom. So, still dusty here and vacuuming daily. We only have one working bathroom at this point, so we are getting tired of all sharing one bathroom!
Nice big ceiling vent fan - this is in half bath. Similar in the whole bath just behind.
First of the drywall sheets!
First cuts - in front of the new doorway we cut for the whole bath.
Hopefully soon, I'll have pics of seeds for 2022!
We also need to decide on which chicks we will be ordering for 2022.