Coop Construction pixs #2 WALLS UP!!!!!

Manok-Tao

Songster
10 Years
Jan 6, 2010
295
12
121
W-S NC
Finally making decent progress, all walls framed and raised! Roof will be up and shingled tomorrow before inbound snow.
After I laid the plywood on the floor structure I used it as a flat, level work table to frame up all 4 walls, worked great, ultra easy work table and everything was SQUARE...tada.
The structure on the walls lends to windows, doors, nest boxes etc, the rest is overkill....that's how I roll.
Hope the pixs are enjoyable and helpful to those in the design phase.
John
46669_floor_sheathed.jpg


46669_floor_as_table.jpg


46669_walls_framed.jpg


46669_north_wall.jpg


46669_west_wall.jpg


46669_east_wall.jpg


46669_walls_done.jpg
 

New posts New threads Active threads

Back
Top Bottom