- Thread starter
- #3,271
good Morning,
Yesterday was a full day
We started on the coop roof
I got up top and unscrewed the sheet metal, DH pulls it down as I unattached it,
Harvested herbs yesterday

The huge bush thing is Motherwort- I also did the horehound but dont have a pic of it
on the end are 2 big oreganos-
and lemon balm; yarrow; burgamot
New Mama #2 on the left-- Mamma #1 in the middle Broody#3 on the right
3 eggs hatched #4 was a rotten dud-- it stunk so Mamma #2 has 3 chicks
COFFEE, Please!!
paint dried at 3pm, we got the Tar-Paper down, the new plywood-
the coop portion will have a 1ft over hang on the front and back and 6in on the north side. today we wiil put the 8ft sheet metal we , back up, but pushing it forward a foot- and adding new, on the back end to extend--
HD did not have any 10 foot sections or we would have bout 3 of them-
DH didnt want to do the covered run part- building materials are EXPENSIVE--
WTH,,,
I lost a day 


I really thought yesterday was Thursday
Yesterday was a full day
We started on the coop roof
I got up top and unscrewed the sheet metal, DH pulls it down as I unattached it,

Harvested herbs yesterday

The huge bush thing is Motherwort- I also did the horehound but dont have a pic of it

and lemon balm; yarrow; burgamot
New Mama #2 on the left-- Mamma #1 in the middle Broody#3 on the right
3 eggs hatched #4 was a rotten dud-- it stunk so Mamma #2 has 3 chicks

paint dried at 3pm, we got the Tar-Paper down, the new plywood-
the coop portion will have a 1ft over hang on the front and back and 6in on the north side. today we wiil put the 8ft sheet metal we , back up, but pushing it forward a foot- and adding new, on the back end to extend--
HD did not have any 10 foot sections or we would have bout 3 of them-
DH didnt want to do the covered run part- building materials are EXPENSIVE--






I really thought yesterday was Thursday
