I spent most of my day yesterday watching youtube vids on how to operate a ditch which trencher... Last time I used one was in the late 70's and I had an experienced supervisor. All the safety vids say operate on level ground (what's that?)... Meter is at 300 feet above sea level, house 700 feet. So 400 foot clime over a quarter mile. Oh and avoid rocks, that's all I've got around here.
