I made decent progress on the expansion today. :wee

The big 6 bay nest box is built and installed, north wall and south wall have siding, the salvaged window is in, and that east wall is set in place and attached.

There is still a lot to do but the big parts are out of the way.

I didn't take pics yet. My mess is EVERYWHERE out there right now.
 
Stromberg has hwc on sale until the 13th. They have 6ft and free shipping if over $100 https://www.strombergschickens.com/product/galvanized-hardware-cloth
Screenshot_20210410-200536.png
 

New posts New threads Active threads

Back
Top Bottom