BY Bob to the Rescue

Monday

I arrived at my daughter's on Monday night and they had gotten their part done. The floor and tub were tiled and the walls painted. The first thing I did Monday night was to install the toilet.

There had been no toilet for a week. Did I mention the house only has 1 bathroom and was built in 1948.

20210621_220812.jpg


There was no door so I grabbed a rug I keep in my car for emergencies and tacked it up.
20210623_005100.jpg


Since it took me 7 hours to drive there, it was midnight Monday when the toilet was operational.

Tuesday
We woke up early Tuesday and went to work. Tuesday's priorities in order of installation.
  1. Vanity Light
  2. Medicine Cabinet
  3. Vanity
  4. Sink and faucet
  5. Caulk tub
  6. Install shower head and shower fixtures
By the end of the day, all was completed but a flaw was identified in the shower control knob. The shower was usable but it was 12:30 am when we were done and showers would wait until morning.

20210623_010107.jpg

20210623_010319.jpg


Wednesday
It was hard waking up on Wednesday until you realized a shower was waiting. Everyone showered before we got started. There were a lot of smiles.

The big project on Wednesday was to install a new door. I hate installing doors. Along with the door we wanted to install
  • GFI outlet
  • Towel rack
  • Toilet paper holder
  • Exhaust fan
  • Baseboard molding
  • Window trim
  • Marble window sill
  • Bathroom door trim
  • Door knob
We got the door installed, outlet, towel rack, exhaust fan, toilet paper holder, baseboard, and marble window sill.

It was when I was working on the window trim when I made my first error. It was about midnight and I mis-measured a cut on the left side trim. I had them purchase extra trim but before I cut that window trim again I wanted to cut the door trim.

Once I cut the door trim I uncovered issues mounting it to the door frame. Nothing was even. The door frame, studs, and wall were all at different depths. There was no good way to fasten the trim. At that point I pulled the plug on everything. I put on the door knob and sent everyone to bed around 1:30 am.

Thursday
I only had a half day on Thursday as I had to drive home. Everyone was up early and off to the home improvement store we went. After searching through all the trim options, I found two things which would make a nice fix. We bought the trim and headed back.

Everything went together beautifully. It turned out like it was designed that way. I finished the window trim and I was done.

Close up door trim. There are 4 pieces of wood making up this trim. I am still surprised at how well it came out.
Resized_20210625_213722.jpeg


The rest was on them. I left them with a functioning bathroom again.

As I pulled out of their driveway, my son-in-law's father pulled in to complete the electrical and help with finishing the trim and painting the door.

Here is the bathroom as I left it.

Bathroom door, inside

Resized_20210625_213718.jpeg


Outside
20210624_143335.jpg


Vanity, sink, medicine cabinet, and window.
20210624_143353.jpg

20210624_143624.jpg


Window and bath tile.
20210624_143358.jpg

20210624_143604.jpg


Bath tile and shower fixtures
20210624_143532.jpg
20210624_143556.jpg


20210624_143538.jpg


Light fixture and exhaust fan
20210624_143606.jpg


Water running into the tub.
20210624_143823.jpg
 
Last edited:
BY Bob to the Rescue

Monday

I arrived at my daughter's on Monday night and they had gotten their past done. The floor and tub were tiled and the walls painted. The first thing I did Monday night was to install the toilet.

There had been no toilet for a week. Did I mention the house only has 1 bathroom and was built in 1948.

View attachment 2735168

There was no door so I grabbed a rug I keep in my car for emergencies and tacked it up.
View attachment 2735170

Since it took me 7 hours to drive there, it was midnight Monday when the toilet was operational.

Tuesday
We woke up early Tuesday and went to work. Tuesday's priorities in order of installation.
  1. Vanity Light
  2. Medicine Cabinet
  3. Vanity
  4. Sink and faucet
  5. Caulk tub
  6. Install shower head and shower fixtures
By the end of the day, all was completed but a flaw was identified in the shower control knob. The shower was usable but it was 12:30 am when we were done and showers would wait until morning.

View attachment 2735171
View attachment 2735172

Wednesday
It was hard waking up on Wednesday until you realized a shower was waiting. Everyone showered before we got started. There were a lot of smiles.

The big project on Wednesday was to install a new door. I hate installing doors. Along with the door we wanted to install
  • GFI outlet
  • Towel rack
  • Toilet paper holder
  • Exhaust fan
  • Baseboard molding
  • Window trim
  • Marble window sill
  • Bathroom door trim
  • Door knob
We got the door installed, outlet, towel rack, exhaust fan, toilet paper holder, baseboard, and marble window sill.

It was when I was working on the window trim when I made my first error. It was about midnight and I mis-measured a cut on the left side trim. I had them purchase extra trim but before I cut that window trim again I wanted to cut the door trim.

Once I cut the door trim I uncovered issues mounting it to the door frame. Nothing was even. The door frame, studs, and wall were all at different depths. There was no good way to fasten the trim. At that point I pulled the plug on everything. I put on the door knob and sent everyone to bed around 1:30 am.

Thursday
I only had a half day on Thursday as I had to drive home. Everyone was up early and off to the home improvement store we went. After searching through all the trim options, I found two things which would make a nice fix. We bought the trim and headed back.

Everything went together beautifully. It turned out like it was designed that way. I finished the window trim and I was done.

Close up door trim. There are 4 pieces of wood making up this trim. I am still surprised at how well it came out.
View attachment 2735244

The rest was on them. I left them with a functioning bathroom again.

As I pulled out of their driveway, my son-in-law's father pulled in to complete the electrical and help with finishing the trim and painting the door.

Here is the bathroom as I left it.

Bathroom door, inside

View attachment 2735243

Outside
View attachment 2735174

Vanity, sink, medicine cabinet, and window.
View attachment 2735175
View attachment 2735182

Window and bath tile.
View attachment 2735176
View attachment 2735180

Bath tile and shower fixtures
View attachment 2735177View attachment 2735179

View attachment 2735178

Light fixture and exhaust fan
View attachment 2735181

Water running into the tub.
View attachment 2735183
I am truly in awe! Looking GOOD.
 
BY Bob to the Rescue

Monday

I arrived at my daughter's on Monday night and they had gotten their past done. The floor and tub were tiled and the walls painted. The first thing I did Monday night was to install the toilet.

There had been no toilet for a week. Did I mention the house only has 1 bathroom and was built in 1948.

View attachment 2735168

There was no door so I grabbed a rug I keep in my car for emergencies and tacked it up.
View attachment 2735170

Since it took me 7 hours to drive there, it was midnight Monday when the toilet was operational.

Tuesday
We woke up early Tuesday and went to work. Tuesday's priorities in order of installation.
  1. Vanity Light
  2. Medicine Cabinet
  3. Vanity
  4. Sink and faucet
  5. Caulk tub
  6. Install shower head and shower fixtures
By the end of the day, all was completed but a flaw was identified in the shower control knob. The shower was usable but it was 12:30 am when we were done and showers would wait until morning.

View attachment 2735171
View attachment 2735172

Wednesday
It was hard waking up on Wednesday until you realized a shower was waiting. Everyone showered before we got started. There were a lot of smiles.

The big project on Wednesday was to install a new door. I hate installing doors. Along with the door we wanted to install
  • GFI outlet
  • Towel rack
  • Toilet paper holder
  • Exhaust fan
  • Baseboard molding
  • Window trim
  • Marble window sill
  • Bathroom door trim
  • Door knob
We got the door installed, outlet, towel rack, exhaust fan, toilet paper holder, baseboard, and marble window sill.

It was when I was working on the window trim when I made my first error. It was about midnight and I mis-measured a cut on the left side trim. I had them purchase extra trim but before I cut that window trim again I wanted to cut the door trim.

Once I cut the door trim I uncovered issues mounting it to the door frame. Nothing was even. The door frame, studs, and wall were all at different depths. There was no good way to fasten the trim. At that point I pulled the plug on everything. I put on the door knob and sent everyone to bed around 1:30 am.

Thursday
I only had a half day on Thursday as I had to drive home. Everyone was up early and off to the home improvement store we went. After searching through all the trim options, I found two things which would make a nice fix. We bought the trim and headed back.

Everything went together beautifully. It turned out like it was designed that way. I finished the window trim and I was done.

Close up door trim. There are 4 pieces of wood making up this trim. I am still surprised at how well it came out.
View attachment 2735244

The rest was on them. I left them with a functioning bathroom again.

As I pulled out of their driveway, my son-in-law's father pulled in to complete the electrical and help with finishing the trim and painting the door.

Here is the bathroom as I left it.

Bathroom door, inside

View attachment 2735243

Outside
View attachment 2735174

Vanity, sink, medicine cabinet, and window.
View attachment 2735175
View attachment 2735182

Window and bath tile.
View attachment 2735176
View attachment 2735180

Bath tile and shower fixtures
View attachment 2735177View attachment 2735179

View attachment 2735178

Light fixture and exhaust fan
View attachment 2735181

Water running into the tub.
View attachment 2735183
Great work Bob! I'm amazed you achieved so much in such a short space of time

:th
 