The Roof is On
One of the reasons there is no Ask Aurora is that today was nice enough to finish the roof on the main coop.  So i took my lunch and got the panels installed.  It is barely warm enough to caulk but I managed to pull it off.  
I started by putting the foam spacers in place.  I caulked the top of them and the edge on the right.
View attachment 3379097
I then installed and screwed down the panel.
View attachment 3379098
I extended the foam with caulk and installed the second panel.
View attachment 3379099View attachment 3379100
I then installed the final panel.
View attachment 3379101
I then caulked and sealed the ridge line to the quarter round at the peak of the roof.
View attachment 3379102
Next I installed a piece of PVC edging to finish off the edge of the roof.  This side is in the lee of the prevailing wind.
Edging
View attachment 3379110
Edging installed
View attachment 3379109
This end of the coop, above the porch, gets the strongest winds.  So I did Extra to keep the wind from cashing the edge and pulling the roof off.  I had an overhang of roofing and bent it down to create a flush edge.
View attachment 3379103
Once I had it bent down I installed the PVC edge.
View attachment 3379104
All finished!
View attachment 3379105